Property Details
NO DETENTION REQUIRED with the new "simple residential drainage plan" with COH. Amazing opportunity for a shovel-ready* project with 10 designed duplexes, currently going through final stages of individual permitting with COH. Current replat/design will NOT require costly drainage detention infrastructure.*Anticipated final approval of plans: NOV 2024. Current developer purchased the nearly 1 acre site and subdivided into 10 lots. Replat already includes the right-of-way to the COH. Three different duplex designs were designed for the lots. Each duplex consists of 3 beds, 2 full baths per unit. 10' ceilings and approx 2,900 sq ft each. Comparable duplexes are selling in the mid to high 400's. This project would save you many months and no need to invest in replatting or designs. Buyers are encouraged to conduct their own due diligence and consult with architects, contractors, and engineers.